💰 Financial Calculators ❤️ Health & Fitness Calculators 📐 Math Calculators 🔄 Conversion Calculators 📊 Business Calculators 🏗️ Construction Calculators 📅 Date & Time Calculators 🧮 Everyday Calculators

Load Shedding Calculator

Calculate the real financial impact of load shedding on your household or business. Enter your stage level, frequency, productivity loss, and backup power options to see your monthly cost and the right UPS/inverter/battery size for your needs.

Quick Calculator Get a fast estimate
days
R
Fridge/freezer contents lost, candles, etc.
hrs/day
Hours of productive work lost per outage day
R/hr
Your earnings or business value per hour
R
If using a generator. Leave 0 if not applicable.
Monthly Financial Impact
R 11 700
Hours Without Power/Month
160 hours
Productivity Loss
R 10 000
Food Spoilage
R 500
Generator Fuel
R 1 200
Annual Impact
R 140 400
Recommended Backup (Lights, fridge, TV (~4–6 hrs))
R20 000–R35 000
Link copied to clipboard!

How to Use the Load Shedding Calculator

  1. Stage Level: Select the current or average Eskom stage you experience.
  2. Days per Month: How many days per month you experience load shedding.
  3. Food Spoilage: Estimate the value of food lost monthly due to fridge/freezer outages.
  4. Work Hours Lost: Hours of productive work lost per load shedding day.
  5. Generator Fuel: Monthly fuel cost if you use a generator.

The Extended Calculator below shows a stage timeline SVG with home, business, and essential services tabs. The Professional Calculator sizes your backup power from actual appliance loads with autonomy estimates.

Need more detail?
📊 Extended Calculator More options, charts, and scenario comparison
Stage 2 — Daily Power Schedule (avg)
0:006:0012:0018:0024:0020h ON / 4h OFF
Select Applicable Costs:
Monthly Home Impact
R 440.00
Per Hour Off
R 5.50
Per Day
R 22.00
Annual Cost
R 5280.00

Load Shedding Stages Explained

Eskom load shedding hours per day

Stage 1: ~2 hours/day — 4 rotational blocks per week

Stage 2: ~4 hours/day

Stage 3: ~6 hours/day

Stage 4: ~8 hours/day (most common at peak crisis)

Stage 5: ~10 hours/day

Stage 6: ~12 hours/day

Use EskomSePush or eskom.co.za to check your area's schedule.

Backup Power Sizing Guide

What can each system power?

Small (100Ah/1.2kWh — R8,000–R15,000): LED lights, Wi-Fi router, laptop, phone charging for 2–4 hours.

Medium (200Ah/2.4kWh — R20,000–R35,000): Lights, fridge, TV, laptop for 4–6 hours. Covers Stage 4 outages.

Large (5kWh+ — R50,000–R80,000): Most appliances for 8–12 hours. Best paired with solar panels.

Need full precision?
🔬 Professional Calculator Complete parameters, sensitivity analysis, and detailed breakdown
Select Loads to Back Up
IncludeLoadWattsCritical?
Internet routerYes
Laptop x1Yes
LED lights (5x)Yes
TV + decoder
Fridge (medium)Yes
Security alarm systemYes
CCTV system
Desktop PC
Load Summary
480W total / 280W critical
Required Energy
1.92 kWh
Battery Autonomy
4.0 hrs
System Sizing Recommendations
SolutionMinimum SizeEstimated CostPros
UPS System1.92 kWhR 8 640Seamless switchover, quiet
Inverter + Battery0.6 kVA / 50Ah @ 48VR 3 450Scalable, can add solar
Generator1 kVAR 8 000Unlimited runtime
Generator Fuel Cost Analysis
R
Litres Per Day
6.0 L
Monthly Fuel Cost
R 2 700
Annual Fuel Cost
R 32 400

Frequently Asked Questions

Stage 1: ~2 hrs/day. Stage 2: ~4 hrs. Stage 3: ~6 hrs. Stage 4: ~8 hrs. Stage 5: ~10 hrs. Stage 6: ~12 hrs. Stages 7–8 reach 14–16 hrs/day but are rarely declared officially.
Basic (lights, router, laptop): 100Ah battery (R8,000–R15,000). Standard (fridge, TV, lights, 4–6hrs): 200Ah (R20,000–R35,000). Full backup (most appliances, 8+ hrs): 5kWh+ system (R50,000–R80,000).
Load shedding costs the SA economy an estimated R500m–R1bn per stage per day. Households and businesses face R2,000–R5,000/month in direct costs during Stage 4 from food spoilage, productivity loss, and fuel.
A UPS switches within milliseconds — ideal for computers. An inverter switches in 20–40ms — fine for fridges, lights, and TVs. A hybrid inverter can also connect solar panels and is the most popular load shedding solution in SA.
Use the EskomSePush app (free, by suburb) or visit eskom.co.za for the national schedule. Your municipality may have their own schedule if not directly supplied by Eskom.

Related Calculators